Superstructure Rate
₹1,599 / sq.ft (built-up area)
Covers masonry, structural concrete, flooring, windows, doors, electrical, plumbing, and paint.
Substructure Rate (Plinth)
₹500 / sq.ft (plinth area)
Covers standard excavation, foundation layout, column starters, footings, and plinth beam filling.
Design & Drawings
- Detailed 2D Architectural Floor Plans
- 2D Preliminary Building Elevation View
- Basic 3D Rendered Exterior View
- 2D Construction Approval Drawings
Foundation & Structure
- Excavation depth up to 5 feet from ground level
- Backfilling in foundation and plinth with clean Sand
- Plinth height of 3 feet from ground level
- Floor height of 10'6" (slab top to slab top)
- High-quality Shuttering Ply for slab, footing, beams, and columns
- Lintels over all door & window openings at 7'0" height
- Regular dog-legged staircase with RCC waist slab
- Basic chajjas projections (15"–18" deep) matching window widths
Core Materials
- Steel: Rungta Steel, Titan or equivalent (ISI standard TMT; 6mm–20mm rods as per structural design)
- Cement: JSW Jindal Cement or equivalent (53 Grade PPC for masonry; 43 Grade for plastering)
- Sand: M-Sand for Masonry and structural concrete, P-Sand for Plastering work
- Bricks: Best quality 9" Fly Ash bricks for external walls, 5" fly ash bricks for internal walls
Plaster & Waterproofing
- Internal Plastering: 12mm thickness with smooth float finish
- External Plastering: 20mm thickness with integrated waterproofing chemical
- Waterproofing: Full coverage in internal washrooms, balconies, and above terrace slabs
Plumbing & Toilets
- Pipes: Astral, Oriplast or equivalent CPVC (internal) & PVC (drainage)
- Fittings Budget: Up to ₹25,000 per toilet
- Brand: Jonson or equivalent CP fittings & sanitaryware
- Floor-mounted EWC, PVC cistern, health faucet, wall mixer, shower head, and 4 angle cocks included
- Wash basin with pillar cock (without counter top)
- Waterproof PVC doors for washrooms
- Note: Bathroom wall & floor tiles are not included in the Basic package.
Kitchen
- Granite Countertop: Up to ₹80/sq.ft allowance
- Wall Tiles: Ceramic wall tiles up to ₹40/sq.ft budget, up to 3 feet height above counter
- Kitchen Sink: SS 304 Grade stainless steel sink (budget up to ₹2,000)
- Tap: Kitchen sink tap allowance up to ₹1,000
Flooring
- Living, Dining & Bedroom: Vitrified tiles (size 4'×2') with a budget of up to ₹40/sq.ft
- Staircase: Premium Granite flooring with a budget of up to ₹80/sq.ft
- Balcony & Open Areas: Anti-skid ceramic tiles up to ₹40/sq.ft
- Parking Floor: Concrete tiles / pavers up to ₹30/sq.ft
- Brand: Oasis or equivalent tiles
Painting & Finish
- Interior Putty: 2 coats of premium JK / Birla Wall Putty
- Interior Paint: 1 coat primer & 2 coats Asian Tractor Emulsion
- External Paint: 1 coat primer & 2 coats Asian ACE Exterior Emulsion
- Metal & Wood Paint: 2 coats of synthetic enamel for window grills and MS railings
Doors & Windows
- Main Door: Teak wood frame & door (budget ₹20,000 inclusive of fixtures, size 7'x3'6")
- Internal Doors: Flush doors with cement frames, primer coated (budget ₹7,500, Sainik or equivalent, size 7'x3')
- Windows: 2-track sliding Aluminium windows with 5mm clear glass (budget up to ₹250/sq.ft)
- Window Grills: Safety grills made of 12mm MS bars @ 4" spacing, considered up to 1 kg/sqft
- Railings: MS railings with enamel paint (simple designs, 16-gauge pipes) for staircase & balcony
Electrical Works
- Wiring: Finolex or equivalent fire-retardant (FR) copper wires
- Switches & Boards: Anchor Roma / Greatwhite modular switches & sockets
- MCB & DB Box: L&T, Greatwhite or equivalent distribution boards
Exclusions from Scope (Not included in the package rate)
- Borewell drilling, pump set installations, and auxiliary connections.
- Outer boundary compound walls and main gates.
- Interior woodwork, modular kitchens, closets, wardrobes, and cabinets.
- TPCODL electrical meters, connection charges, panels, and main line cabling.
- Road cutting permissions, charges, and repairing expenses (BMC/CMC).
- Hard rock excavation, drilling, or breaking if encountered during construction.
- Government plan approval fees and regulatory liaison charges.